GO 59 (floating dock)
| History | |
|---|---|
|  Italy | |
| Name | GO 59 | 
| Builder | Cantiere Navale Giacalone di Mazara del Vallo (Trapani) | 
| Cost | €7 million[1] | 
| Laid down | 2013 | 
| Launched | 2014 | 
| Acquired | 2011 | 
| Commissioned | march 2014 | 
| In service | 1 | 
| Homeport | Brindisi[2] | 
| General characteristics | |
| Type | Floating dry dock | 
| Length | |
| Beam | 
 | 
| Draught | 8.0 m (26 ft 3 in) (max)Error: has synonymous parameter (help) | 
| Draft | 9.5 m (31 ft 2 in) (max)Error: has synonymous parameter (help) | 
| Propulsion | 
 | 
| Notes | lifting capability 1.000 t (0.984 long tons) | 
GO 59 is a Floating dry dock of the Marina Militare.[4]
History
Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7] 
These are the technical specifications of MM for its realization.
References
- ^ Press releasedifesa.it (in Italian) Archived 28 November 2016 at the Wayback Machine
- ^ "Trasferito a Brindisi il bacino galleggiante GO59 - Marina Militare". Archived from the original on 28 November 2016. Retrieved 27 November 2016.
- ^ "Generalità e Struttura - Marina Militare". Archived from the original on 27 November 2016. Retrieved 27 November 2016.
- ^ "Naviglio locale – Marina Militare". Marina.difesa.it. Retrieved 27 November 2016.
- ^ "Marina Militare". www.marina.difesa.it. Archived from the original on 26 August 2014.
- ^ "Marina Militare/ Mezzi. Il bacino Go59 arriva ad Augusta". 11 March 2014.
- ^ "Trasferito a Brindisi il bacino galleggiante GO59 - Marina Militare". www.marina.difesa.it. Archived from the original on 28 November 2016.
External links
- Ships Marina Militare website
