 Line 4 train interior LCDs
Line 4 train interior LCDs
Line 4 of the Nanning Metro is a rapid transit line in Nanning. The line opened on 23 November 2020. The line is 20.7 km long with 16 stations.[1][2]
Opening timeline
| Segment | Commencement | Length | Station(s) | Name | 
| Hongyun Lu — Lengtangcun | 23 November 2020 | 20.7 km (12.86 mi) | 16 |  | 
Stations
| Station name | Transfer | Distance km
 | Location | 
| English | Chinese | Zhuang | 
|  | 
| Hongyun Lu | 洪运路 | Roen Hungzyin |  |  |  | Jiangnan | 
| Nalicun | 那历村 | Nazlizcunh |  |  |  | 
| Nahong Overpass | 那洪立交 | Nazhungz Lizgyauh | 5 |  |  | 
| Jinyang Lu | 金阳路 | Roen Ginhyangz |  |  |  | 
| Tongyuan Lu | 通源路 | Roen Dunghyenz |  |  |  | 
| Dashatian | 大沙田 | Dasahdenz | 2 |  |  | Liangqing | 
| Jinxiang Dadao | 金象大道 | Daihloh Ginhsieng |  |  |  | 
| Wuxiangling | 五象岭 | Vujsienglingj |  |  |  | 
| Yuxiang Lu | 玉象路 | Roen Yisieng |  |  |  | 
| Advanced Business Park | 总部基地 | Cungjbu Gihdi | 3 |  |  | 
| Feilong Lu | 飞龙路 | Roen Feihlungz |  |  |  | 
| Guangxi Sports Center West | 体育中心西 | Baihsae Dijyuz Cunghsinh |  |  |  | 
| Guangxi Sports Center East | 体育中心东 | Baihdoeng Dijyuz Cunghsinh |  |  |  | 
| Liangqing Bridge South | 良庆大桥南 | Baihnamz Liengzging Daihgiuz |  |  |  | 
| Liangqingxu | 良庆圩 | Liengzginghih |  |  |  | 
| Lengtangcun | 楞塘村 | Lwngzdangzcunh |  |  |  | 
|  | 
References
| Public transportation in Guangxi (GX) | 
|---|
|  Nanning Metro | | Lines in operation |  | 
|---|
 | Under construction |  | 
|---|
 | Planned |  | 
|---|
 | 
|---|
|  Guilin Rail Transit |  | 
|---|
|  Liuzhou Rail Transit |  | 
|---|
| Transportation hubs | |  Int'l airports |  | 
|---|
 |  Railway stations |  | 
|---|
 | 
|---|
| 
China: AHBJCQFJGD/HK/MOGSGXGZHAHBHEHIHLHNJLJSJXLNNMNXQHSCSDSHSNSXTJXJXZYNZJ
 |