Chengdu–Dazhou–Wanzhou high-speed railway
| Chengdu–Dazhou–Wanzhou high-speed railway 成达万高速铁路 | |
|---|---|
![]() Under construction near Nanchong North | |
| Overview | |
| Status | Under construction |
| Termini |
|
| Stations | 13 |
| Service | |
| Operator(s) | China Railway Chengdu Group |
| Technical | |
| Line length | 477 km (296 mi)[1] |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 350 km/h (217 mph) |
The Chengdu–Dazhou–Wanzhou high-speed railway or Chengdawan HSR (Chinese: 成达万高速铁路; pinyin: Chéngdáwàn Gāosù Tiělù) is a high-speed railway currently under construction in China. This line forms part of the Shanghai–Chongqing–Chengdu high-speed railway.
History
This railway was planned as early as 2015.[2] Construction began on 30 September 2022.[1]
Route
The newly built section runs between Ziyang West and Wanzhou North. Trains bound for Chengdu and Chengdu Tianfu International Airport can use the Chengdu–Yibin high-speed railway to head further northwest. The Xi'an–Chongqing high speed railway and Zhengzhou–Wanzhou high-speed railway connects to the Chengdawan HSR and allow trains to continue north to Xi'an or east to Zhengzhou.
Stations
| Station Name[1] | Chinese | Metro transfers/connections | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Ziyang West | 资阳西 | Chengdu–Yibin high-speed railway | ||||||||
| Lezhi | 乐至 | |||||||||
| Suining | 遂宁 | |||||||||
| Pengxi South | 蓬溪南 | |||||||||
| Nanchong North | 南充北 | |||||||||
| Yingshan West | 营山西 | |||||||||
| Quxian North | 渠县北 | |||||||||
| Dazhou South | 达州南 | Xi'an–Chongqing high speed railway (Chongqing Branch) | ||||||||
| Kaijiang South | 开江南 | |||||||||
| Yuexi | 岳溪 | |||||||||
| Wanzhou North | 万州北 | Xi'an–Chongqing high speed railway (Wanzhou Branch) | ||||||||
References
- ^ a b c "全线动工!成达万高铁新进展". 2022-09-30.
成达万高铁全线共设天府站、天府机场站、资阳西站、乐至站、遂宁站、蓬溪南站、南充北站、营山西站、渠县北站、达州南站、开江南站、岳溪站、万州北站等13座车站
- ^ "成都将新建4条出川铁路". 中国铁路成都局集团有限公司 (China Railway Chengdu Group Co., Ltd.). Retrieved 2020-12-24.
